TheVirtualTim
Well-Known Member
- First Name
- Tim
- Joined
- Oct 11, 2020
- Threads
- 26
- Messages
- 1,366
- Reaction score
- 2,469
- Location
- Dearborn, MI
- Vehicles
- ‘21 Mach-E First Edition, ‘23 Mach-E GT Performance
Realizing that a pretty significant part of the install is labor I only wanted to pay to have the job done once. I opted for the wiring that can handle 60 amps (which allows a 48 amp continuous load). I spent a little more ... but this should avoid me needing to have it upgraded in the future.
Sponsored