4/11/22 build week chat

NJ_MachE

Well-Known Member
Joined
Feb 10, 2022
Threads
3
Messages
603
Reaction score
604
Location
New Jersey
Vehicles
'22 Mach-E Select RWD wComfort/Tech, '16 Honda Fit
Country flag
Looks like this may have been a false alarm. I reached out to Ford via chat today. They said that it's still in production and that the 5/11-17 is the ETA to move to the next phase, which is shipped. Not sure why it takes several weeks to go from production to shipped, but it sounds like my dealer may have mis-read things.
From reviewing other threads, the Ford Chat folks seem to commonly misread the estimated delivery date range on the VVR (in your case, 5/11-5/17) as the estimated date range that you will move into the next status. I would actually trust your dealer more in this case. That said, the delivery date range is not necessarily accurate either! Hopefully you all start getting built and shipped emails soon.
Sponsored

 

NewGuy

Well-Known Member
Joined
Sep 30, 2021
Threads
31
Messages
494
Reaction score
633
Location
NJ
Vehicles
Ready to order
Country flag
From reviewing other threads, the Ford Chat folks seem to commonly misread the estimated delivery date range on the VVR (in your case, 5/11-5/17) as the estimated date range that you will move into the next status. I would actually trust your dealer more in this case. That said, the delivery date range is not necessarily accurate either! Hopefully you all start getting built and shipped emails soon.
Trust no one. Got it!
 

NewGuy

Well-Known Member
Joined
Sep 30, 2021
Threads
31
Messages
494
Reaction score
633
Location
NJ
Vehicles
Ready to order
Country flag
This is where my dealer got those dates. Does that look like delivery?

Ford Mustang Mach-E 4/11/22 build week chat 1650487533819
 

NJ_MachE

Well-Known Member
Joined
Feb 10, 2022
Threads
3
Messages
603
Reaction score
604
Location
New Jersey
Vehicles
'22 Mach-E Select RWD wComfort/Tech, '16 Honda Fit
Country flag
This is where my dealer got those dates. Does that look like delivery?

1650487533819.png
Yes-- the faded ETA header at the top indicates estimated arrival at your dealership. But the Ford Chat folks often misread it as the estimated next status change date. As that VVR gets longer the ETA will probably stay relatively consistent. It sometimes does update. Here is another VVR somebody from an earlier build week posted https://www.macheforum.com/site/threads/01-03-22-build-week-chat.11959/page-70#post-346154

Unfortunately it's badly formatted and doesn't include headers but his ETA never changed the whole time (February 23-March 1). He got his car February 11.
 

FarSide

Well-Known Member
Joined
Oct 16, 2021
Threads
2
Messages
244
Reaction score
185
Location
Fairfield, CT
Vehicles
Jaguar F-Type '70 Vet, Outback Onyx, '04 Wrangler
Country flag
I just looked at the build week chats of 4/4 & 4/18.

The 4/4 people look happy. Multiple cars scheduled 4/4, built 4/7, and shipped 4/13.

The 4/18 group looks like our threads one week ago. Modules are scarce, no one is happy but one car was confirmed as built. Someone is probably getting a 420 car :)

Our group is probably wrapping up or all built by tonight.?. How and when Ford confirms it's built seems out of synch from what the dealers see. We just need to get shipped now... ASAP
 


MachEMaster

Well-Known Member
First Name
Will
Joined
Jan 25, 2022
Threads
27
Messages
1,052
Reaction score
1,212
Location
Canada
Vehicles
1997 GMC Yukon GT
Occupation
Aircraft Maintenance Engineer
Country flag
Looks like this may have been a false alarm. I reached out to Ford via chat today. They said that it's still in production and that the 5/11-17 is the ETA to move to the next phase, which is shipped. Not sure why it takes several weeks to go from production to shipped, but it sounds like my dealer may have mis-read things.
Don’t feel too bad. My Dealer enthusiastically said your MME is Produced! Then said it has a 13 June 2022 delivery?
 

NewGuy

Well-Known Member
Joined
Sep 30, 2021
Threads
31
Messages
494
Reaction score
633
Location
NJ
Vehicles
Ready to order
Country flag
Yes-- the faded ETA header at the top indicates estimated arrival at your dealership. But the Ford Chat folks often misread it as the estimated next status change date. As that VVR gets longer the ETA will probably stay relatively consistent. It sometimes does update. Here is another VVR somebody from an earlier build week posted https://www.macheforum.com/site/threads/01-03-22-build-week-chat.11959/page-70#post-346154

Unfortunately it's badly formatted and doesn't include headers but his ETA never changed the whole time (February 23-March 1). He got his car February 11.
I guess the question is whether or not I can trust you!

(Thanks!!)
 
OP
OP

RMoore

Well-Known Member
First Name
Rob
Joined
Jul 25, 2021
Threads
75
Messages
1,139
Reaction score
801
Location
New Jersey
Vehicles
Audi Q5, Toyota Sienna, 2022 Mach e
Country flag
Interesting development. Prompted by @NewGuy I got on the chat line with Ford as well today and got the exact same info about my build date and moving to the next phase mid May (which they interpreted as shipping). When I asked how long to the dealer she said she didn't have that info. But @NJ_MachE you have given me new hope. Guess I should schedule my ChargePoint install soon.
 

machEfan1

Member
First Name
J
Joined
Apr 8, 2022
Threads
0
Messages
15
Reaction score
15
Location
USA
Vehicles
Mach E Premium AWD ER
Country flag
I spoke with my dealer two days ago. They told me my order was built 4/14 and gave an ETA for 5/22-5/28. I am hoping that is the actual estimated arrival with the dealer and not the time to move to the next phase. Batch 5303.
 

FarSide

Well-Known Member
Joined
Oct 16, 2021
Threads
2
Messages
244
Reaction score
185
Location
Fairfield, CT
Vehicles
Jaguar F-Type '70 Vet, Outback Onyx, '04 Wrangler
Country flag
My theory (based on little) was that cars were built and shipped as the weekly batches completed but perhaps cars sit for multiple weeks and trains leave every two or three weeks; I'm sure the other build week chats have figured this out? The 4/4 built gang have had good fortune as they were chipped and shipped quickly. Some of their cars are already in KC. The Easter cars 4/11 & 4/18 and perhaps additional weeks might all be staged and shipped together?? Ford can use excuses like supply chain and Covid for overall production delays but their shipping model could be better; this is old school transportation. I'm sensing a process policy of "it will get there when it gets there".
 

MachEMaster

Well-Known Member
First Name
Will
Joined
Jan 25, 2022
Threads
27
Messages
1,052
Reaction score
1,212
Location
Canada
Vehicles
1997 GMC Yukon GT
Occupation
Aircraft Maintenance Engineer
Country flag
Anyone have any good news this morning!?
 

kayzoqueen

Well-Known Member
First Name
Grace
Joined
Apr 16, 2022
Threads
5
Messages
115
Reaction score
148
Location
Southern California
Vehicles
22' Mach-E GT, Jaguar F-Type, Jeep Rubicon
Country flag
I also used the Ford chat service here is what they said:
It has been produced. It is currently in Ford Mexico Cuautitlan Assembly, EM. With an ETA of Jun-10-2022 for delivery to your dealer.
 

Ninja4hire

Well-Known Member
First Name
Andre
Joined
Jan 13, 2022
Threads
2
Messages
160
Reaction score
188
Location
Bay Area, CA
Vehicles
2022 Shadow Black Mach-e GT, 2018 Camaro SS
Occupation
Not a paid assassin!
Country flag
I also used the Ford chat service here is what they said:
It has been produced. It is currently in Ford Mexico Cuautitlan Assembly, EM. With an ETA of Jun-10-2022 for delivery to your dealer.
If that's the date they gave you, I would realistically expected it delivered the week of May 22nd. The ETA's are usually off by a lot, specially for California deliveries. The Premium I ordered was shipped and delivered within 30 days.
 

kayzoqueen

Well-Known Member
First Name
Grace
Joined
Apr 16, 2022
Threads
5
Messages
115
Reaction score
148
Location
Southern California
Vehicles
22' Mach-E GT, Jaguar F-Type, Jeep Rubicon
Country flag
If that's the date they gave you, I would realistically expected it delivered the week of May 22nd. The ETA's are usually off by a lot, specially for California deliveries. The Premium I ordered was shipped and delivered within 30 days.
Oh wow! So you think it would be here even faster, that's awesome :)
 

MachEMaster

Well-Known Member
First Name
Will
Joined
Jan 25, 2022
Threads
27
Messages
1,052
Reaction score
1,212
Location
Canada
Vehicles
1997 GMC Yukon GT
Occupation
Aircraft Maintenance Engineer
Country flag
Oh wow! So you think it would be here even faster, that's awesome :)
I was browsing my Ford Dealer’s page. They are showing a 2022 CA R1 incoming. I checked the window sticker, and it was in production 11 Apr, Built 12 Apr and shipped! Batch 5184 328/600 With a delivery between May 26-June 01. From what I read on the forum batch 5184 is the last of the 04/04 builds. My Select has been in production limbo since Apr 12. I wish I was on that train…..
Sponsored

 
 







Top