Digitalsteve
Member
- First Name
- Steve
- Joined
- Oct 30, 2021
- Threads
- 3
- Messages
- 24
- Reaction score
- 10
- Location
- 93010
- Vehicles
- 2022 Mach-e GTPE (replaced 2021 Premium RWD)
- Occupation
- Retired
- Thread starter
- #1
Paso Robes, CA: EA just upgraded the Bank of America 4 stall station and there are now 3 stalls at 350amps and a single 150amp. Last night at 9:30 PM I pulled in with 7% remaining. The connection kept timing out. After 3 tries at each of two different 350 amp stalls, I called EA and they ran me through 2 more tries, then reset the station. Still the connection was timing out, so they said try another stall. I went to stall 01 (the 150amp) and it worked perfectly first try. Total wasted time was 30 minutes. Asked for a charging credit for compensation and they said no. Note: I received a text earlier in the day that this station was back on line after an upgrade. Checked availability on the EA app before committing to using it.
Sponsored