Deleted member 5795
Guest
Yes that’s the one I’ve been using to and my order no longer has an ETA delivery date.
Sponsored
Yes that’s the one I’ve been using to and my order no longer has an ETA delivery date.
They didn't deliver mine, nor offer me anything. I do wonder where these are all stacked up. probably multiple locations. I do hope they are chipped in a fair order though. Also I think I would prefer Ford to finish installing and testing rather than some random dealer shop tech. This must be a nightmare for the car companies to manage though.So no surprise my dealer confirmed my GTPE is on chip delay. It was finished built on Sept 2 but is waiting for chips to ship.
He also told me that Ford is now delivering vehicles (not MACHE's) that are missing chips that will be installed later. Or they are offering money back if people take the vehicle as is and never get the chips put in. ? ? ? ? ?
What are you referring to as your dealer order?My dealer order says ETA in mid-October. I wouldn't mind if it was November or even December for cash flow purposes but whatever. As long as the car is tiptop and delivery is before December 31, I'll be happy enough.
The four digit number you get from your dealer. You can enter that order number along with your vin into the site below.What are you referring to as your dealer order?
Yep, I use that one plus Ford’s plus the reservation site.The four digit number you get from your dealer. You can enter that order number along with your vin into the site below.
https://seg.fyi/mache-vin/#/details
Lets hope there is movement again. Mine hasn’t changed.My 8/30 production dated Mach-E GT PE just flipped (got an e-mail) to "built" and says I have an estimated delivery date of 10/4-10/10 ---- did anyone else with a production date with this or before just get a notification?
![]()
I almost think this must be a bug/error? With the chip hold this shouldn't be possible??
unless they start decidng to send to dealers for chip install, or a remote hold lot, which they have done in the past.My 8/30 production dated Mach-E GT PE just flipped (got an e-mail) to "built" and says I have an estimated delivery date of 10/4-10/10 ---- did anyone else with a production date with this or before just get a notification?
![]()
I almost think this must be a bug/error? With the chip hold this shouldn't be possible??
Would make sense considering mach e production was halted the end of this week and Atleast all of next week. Need to get some of these chips cars out before they make new ones. I hope yours is really incoming.My 8/30 production dated Mach-E GT PE just flipped (got an e-mail) to "built" and says I have an estimated delivery date of 10/4-10/10 ---- did anyone else with a production date with this or before just get a notification?
![]()
I almost think this must be a bug/error? With the chip hold this shouldn't be possible??