11/21/2022 Build Week Gang

Teledatageek

Well-Known Member
Joined
Feb 6, 2021
Threads
5
Messages
84
Reaction score
54
Location
Rochester, NY
Vehicles
'24 Lightning; '25 MachE GT
Country flag
I'm a friendly visitor from the 11/14/22 Build week offering some info to you all. Week 11/14/22 has 3 batches in our build "week". Just letting you all know Ford is behind....

11/14/22 Batch 9294 (691 builds) - it appears all are built and some have even shipped!

11/14/22 batch 9380 (1036 builds - it appears they are about 1/2 way through this batch and I do see one on our tracking sheet as shipped today.

11/14/22 batch 9408 (349 builds) - no action yet (I'm #10 in this build group).

So....11/14/22 build week will probably go well into your week before they start on your production builds. Sorry! Just trying to give you some real info....
Well that's interesting.... Is the expectation that Ford can build 2,000 or so MachE's per week? Looks like three batches per week. Given I'm at the end of the 2nd batch, don't see how they are going to build on 11/24 as they have predicted. Bummer!
Sponsored

 

carbon02

Member
Joined
Oct 1, 2021
Threads
1
Messages
23
Reaction score
5
Location
Minnesota
Vehicles
2012 Chevrolet Cruze
Country flag
I'm a friendly visitor from the 11/14/22 Build week offering some info to you all. Week 11/14/22 has 3 batches in our build "week". Just letting you all know Ford is behind....

11/14/22 Batch 9294 (691 builds) - it appears all are built and some have even shipped!

11/14/22 batch 9380 (1036 builds - it appears they are about 1/2 way through this batch and I do see one on our tracking sheet as shipped today.

11/14/22 batch 9408 (349 builds) - no action yet (I'm #10 in this build group).

So....11/14/22 build week will probably go well into your week before they start on your production builds. Sorry! Just trying to give you some real info....
Thanks for commenting and sharing this. I initially read some of the earlier build week threads, but I didn't read them as close as this one. First I've seen of the per build week tracker. I've been following the MME very closely since launch, but didn't really engage because the 2022 order banks were closed early, and I didn't know the availability of a 2023. Happy to be scheduled based on what so many have dealt with in 2021 and 2022.

Next week being a holiday week in the states doesn't help the supply chain either.

Confirmed with Ford Chat build date of 11/22 let's see how far they are off. Who knows!
 
Last edited:

Its_my_wifes_car

Well-Known Member
First Name
Dave
Joined
Dec 26, 2021
Threads
8
Messages
138
Reaction score
123
Location
New Hampshire
Vehicles
2023 - Premium AWD ER
Occupation
HIgher Education Technology
Country flag
Thanks for commenting and sharing this. I initially read some of the earlier build week threads, but I didn't read them as close as this one. First I've seen of the per build week tracker. I've been following the MME very closely since launch, but didn't really engage because the 2022 order banks were closed early, and I didn't know the availability of a 2023. Happy to be scheduled based on what so many have dealt with in 2021 and 2022.

Next week being a holiday week in the states doesn't help the supply chain either.

Confirmed with Ford Chat build date of 11/22 let's see how far they are off. Who knows!
And a note on your reference to 2021 - I’m actually a 2021 order for 2022 … rolled to 2023. Ordered 11 months ago. Not sure what I did to deserve this (non EV state, northeast, lower volume dealer, most popular build, Ford crapshoot, magic 8-ball, blah, blah)….. the whole thing is fascinating.
 

BuckBaker

Well-Known Member
First Name
Buck
Joined
Sep 7, 2022
Threads
2
Messages
75
Reaction score
93
Location
Durham, NC
Vehicles
2023 Mach-E GT Cyber Orange, '86 Bronco, '83 280zx
Occupation
Accountant
Country flag
11/14 build week here checking in. As previously stated most our third batch of 349 cars didn't make it last week. Granted the first two batches had 691 and 1036 in them. Sorry for being the bearer of bad news
 

minders

Well-Known Member
First Name
Mindee
Joined
Aug 31, 2022
Threads
11
Messages
395
Reaction score
634
Location
Newnan, GA
Website
mindersdesigns.etsy.com
Vehicles
25 GTPE Velocity Blue Metallic, 24 M3 Performance
Occupation
Housewife & Student
Country flag
Not keeping my order since I snagged a '22, but I'll add in the info. Window sticker is live. No modules yet. Batch 9479, 400/700. Showing as "in production." Haven't really kept track of this one, but still happy to see movement.
 


BuckBaker

Well-Known Member
First Name
Buck
Joined
Sep 7, 2022
Threads
2
Messages
75
Reaction score
93
Location
Durham, NC
Vehicles
2023 Mach-E GT Cyber Orange, '86 Bronco, '83 280zx
Occupation
Accountant
Country flag
Good morning 11/21 build week gang. Modules have finally loaded for the last of the 11/14 build week guys. You should start seeing progress on your batches!
 
Last edited:

chrisbix36

Member
First Name
Chris
Joined
Oct 24, 2022
Threads
0
Messages
9
Reaction score
1
Location
Philadelphia, PA
Vehicles
2017 Fusion Energi Titanium
Occupation
Manufacturing Management
Country flag
Is anyone in batch 9479 seeing any modules yet? I am in the last batch (9535) and see nothing. Ordertrack's best guess is mine will be built on the 26th or 27th.
 

bigredx86

Well-Known Member
Joined
Aug 25, 2022
Threads
4
Messages
192
Reaction score
153
Location
Pittsburgh, PA
Vehicles
2023 Ford Mach-E Premium STD AWD
Country flag
Is anyone in batch 9479 seeing any modules yet? I am in the last batch (9535) and see nothing. Ordertrack's best guess is mine will be built on the 26th or 27th.
Just checked got modules in batch 9479, wooot! No tear tag yet but hey progress!
 
Last edited:

carbon02

Member
Joined
Oct 1, 2021
Threads
1
Messages
23
Reaction score
5
Location
Minnesota
Vehicles
2012 Chevrolet Cruze
Country flag
Bigredx86-

I also woke up to a full list of BCE modules in batch 9479. BCE assuming Body Control Modules? I'm a long time GM enthusiast first Ford. Assuming the Body might be done, but the powertrain hasn't been installed yet with no PCE or PCM modules?

Credit goes out to Ford Customer Service. I asked for a build day, and they told me 11/22/2022 last week. So maybe they do have line of sight to a certain level of production scheduling dates.

We'll see what happens, I'm betting Ford may have it built, but how bad is the rail negotiations potential strike on 12/5/2022 going to effect delivery? There's always something.
 

Dadams

Well-Known Member
First Name
Darrin
Joined
Jul 17, 2022
Threads
0
Messages
111
Reaction score
104
Location
Grand Rapids, MI
Vehicles
22 Mach E GT-SOLD, 22 Sorento PHEV, 23 MachE GT RR
Country flag
I have modules as well build #318 in 9479. Originally told build day of 11/24
 

bigredx86

Well-Known Member
Joined
Aug 25, 2022
Threads
4
Messages
192
Reaction score
153
Location
Pittsburgh, PA
Vehicles
2023 Ford Mach-E Premium STD AWD
Country flag
Bigredx86-

I also woke up to a full list of BCE modules in batch 9479. BCE assuming Body Control Modules? I'm a long time GM enthusiast first Ford. Assuming the Body might be done, but the powertrain hasn't been installed yet with no PCE or PCM modules?

Credit goes out to Ford Customer Service. I asked for a build day, and they told me 11/22/2022 last week. So maybe they do have line of sight to a certain level of production scheduling dates.

We'll see what happens, I'm betting Ford may have it built, but how bad is the rail negotiations potential strike on 12/5/2022 going to effect delivery? There's always something.
Carbon02, I noticed that to, all its showing us is its moving, once you get a tear tag at the top of the site, then everything has been installed and is good to move on but I don't believe I have anything other then body control modules as well.

FC was very close on mine as well, I asked last week and they said it would be built the 22nd as well. You have to watch terminology as well, they said my build date is the 22nd an I take that as when they actually started on it, like it starts the assembly line.

I have a few friends that work for a few different assembly plants for Ford and they said things change so rapidly dates can be miss construed.
 
Last edited:

carbon02

Member
Joined
Oct 1, 2021
Threads
1
Messages
23
Reaction score
5
Location
Minnesota
Vehicles
2012 Chevrolet Cruze
Country flag
Just noticed a tear tag number was populated. I didn't see that earlier this morning. Probably everything starts with a Tear tag number, that I don't know.

Looks good it might be built this week.
 

ksroskel

Member
First Name
Keith
Joined
Jul 12, 2022
Threads
0
Messages
21
Reaction score
14
Location
Meridian, Idaho
Vehicles
2023 Mach-e GTPE, 2022 F105 SuperCrew LWB Hybrid
Occupation
Electronic Design Engineer
Country flag
Where are people getting the detailed build information? The tracking site shows mine as in production and Ford chat gave me a build date of 11/24. But I am not seeing any detailed information on the build. Batch 9511 254/586
 

Dadams

Well-Known Member
First Name
Darrin
Joined
Jul 17, 2022
Threads
0
Messages
111
Reaction score
104
Location
Grand Rapids, MI
Vehicles
22 Mach E GT-SOLD, 22 Sorento PHEV, 23 MachE GT RR
Country flag
Bigredx86-

I also woke up to a full list of BCE modules in batch 9479. BCE assuming Body Control Modules? I'm a long time GM enthusiast first Ford. Assuming the Body might be done, but the powertrain hasn't been installed yet with no PCE or PCM modules?

Credit goes out to Ford Customer Service. I asked for a build day, and they told me 11/22/2022 last week. So maybe they do have line of sight to a certain level of production scheduling dates.

We'll see what happens, I'm betting Ford may have it built, but how bad is the rail negotiations potential strike on 12/5/2022 going to effect delivery? There's always something.
it won't show modules separately, My 2022 VIN that was built in May looks the same as my 2023.
It just shows all the modules listed as below

PCM
BCM

then all the modules listed.
Sponsored

 
 







Top