Is it normal for the Production date and built date so far apart?

Electric Fusion

Well-Known Member
First Name
Jerome
Joined
Nov 9, 2020
Threads
25
Messages
208
Reaction score
320
Location
Westchester, New York
Vehicles
Tesla Model 3, Audi eTron, TT Roush Mustang, *Mustang Mach E 4X
Occupation
Engineer
Country flag
built date and shipping date not too far apart ..

Ford Mustang Mach-E Is it normal for the Production date and built date so far apart? B8A2DB16-3085-4D8C-890C-8135C8415608
Sponsored

 

GoGoGadgetMachE

Well-Known Member
First Name
Michael
Joined
Jan 23, 2020
Threads
153
Messages
5,612
Reaction score
12,669
Location
Ohio
Vehicles
2021 Mach-E 1st Ed., 2022 Lightning Platinum
Occupation
Professional forum cheerleader and fanboy
Country flag
I didn't get a shipping date yet.

Ford Mustang Mach-E Is it normal for the Production date and built date so far apart? 1610069011610


I got a rock.
 

dbsb3233

Well-Known Member
First Name
TimCO
Joined
Dec 30, 2019
Threads
56
Messages
10,100
Reaction score
11,965
Location
Colorado, USA
Vehicles
2021 Mustang Mach-E FE, 2025 Porche Macan Electric
Occupation
Retired
Country flag
Nothing is very normal right now. Serious shortage of drivers and transport employees. Everything backed up, taking twice as long as normal. Hit and miss whether someone gets lucky and lands an earlier transport that comes available at the right time to the right place.
 


SpaceNeedle

Active Member
Joined
Jun 30, 2020
Threads
10
Messages
40
Reaction score
78
Location
Seattle, WA
Vehicles
Mach E
Country flag
Got this from my dealer when I told him the web site was showing no movement for weeks...


Status
Status Date / Time
In ProductionProducedJan-04-2021, 00:00 EST
In ProductionTrim LineDec-23-2020, 00:00 EST
In ProductionBody ShopDec-18-2020, 00:00 EST
In ProductionSent to PlantDec-10-2020, 09:50 EST
In Order ProcessingScheduled to Day (Dec-16-2020)Oct-29-2020, 08:33 EDT
In Order ProcessingScheduled to Week (Week -of Dec-14-2020)Oct-22-2020, 08:52 EDT
In Order ProcessingUnscheduled- CleanJul-08-2020, 18:16 EDT
 
OP
OP
Electric Fusion

Electric Fusion

Well-Known Member
First Name
Jerome
Joined
Nov 9, 2020
Threads
25
Messages
208
Reaction score
320
Location
Westchester, New York
Vehicles
Tesla Model 3, Audi eTron, TT Roush Mustang, *Mustang Mach E 4X
Occupation
Engineer
Country flag
Got this from my dealer when I told him the web site was showing no movement for weeks...


Status
Status Date / Time
In ProductionProducedJan-04-2021, 00:00 EST
In ProductionTrim LineDec-23-2020, 00:00 EST
In ProductionBody ShopDec-18-2020, 00:00 EST
In ProductionSent to PlantDec-10-2020, 09:50 EST
In Order ProcessingScheduled to Day (Dec-16-2020)Oct-29-2020, 08:33 EDT
In Order ProcessingScheduled to Week (Week -of Dec-14-2020)Oct-22-2020, 08:52 EDT
In Order ProcessingUnscheduled- CleanJul-08-2020, 18:16 EDT
Wow all this time I was thinking it only takes a day to build lol .. thanks for sharing this ..
 
OP
OP
Electric Fusion

Electric Fusion

Well-Known Member
First Name
Jerome
Joined
Nov 9, 2020
Threads
25
Messages
208
Reaction score
320
Location
Westchester, New York
Vehicles
Tesla Model 3, Audi eTron, TT Roush Mustang, *Mustang Mach E 4X
Occupation
Engineer
Country flag
I didn't get a shipping date yet.

1610069011610.png


I got a rock.
you will get it soon ...

quick question..looking at my window sticker it seems Ford is going to install the front plate mounting bracket at the factory? Anyway to stop them .. I don’t want it installed..

Ford Mustang Mach-E Is it normal for the Production date and built date so far apart? F656E6CA-D2C8-4034-A3B2-67530347CADD
 

mamejunkie

Well-Known Member
Joined
Feb 19, 2020
Threads
20
Messages
638
Reaction score
904
Location
Orange County, CA
Vehicles
Premium Mach-E '21, Premium Mach-E '22
Occupation
Software Engineer
Country flag
you will get it soon ...

quick question..looking at my window sticker it seems Ford is going to install the front plate mounting bracket at the factory? Anyway to stop them .. I don’t want it installed..

F656E6CA-D2C8-4034-A3B2-67530347CADD.png
They include the bracket but I believe it is installed at the dealership.
 

engnrng

Well-Known Member
First Name
Bruce
Joined
Feb 8, 2020
Threads
9
Messages
579
Reaction score
826
Location
SoCal
Vehicles
2022 GTPE, Kona EV, 2023 BMW iX
Occupation
Engineer
Country flag
Wow all this time I was thinking it only takes a day to build lol .. thanks for sharing this ..
So, maybe 1 week from Body Shop to Produced, after removing the shutdown days. Right?
 

methorian

Well-Known Member
Joined
Nov 18, 2019
Threads
17
Messages
1,557
Reaction score
2,437
Location
Roanoke, VA
Vehicles
2021 Mach-E First Edition, 2025 Kia EV6 GT-Line
Occupation
IT Admin
Country flag
Got this from my dealer when I told him the web site was showing no movement for weeks...


Status
Status Date / Time
In ProductionProducedJan-04-2021, 00:00 EST
In ProductionTrim LineDec-23-2020, 00:00 EST
In ProductionBody ShopDec-18-2020, 00:00 EST
In ProductionSent to PlantDec-10-2020, 09:50 EST
In Order ProcessingScheduled to Day (Dec-16-2020)Oct-29-2020, 08:33 EDT
In Order ProcessingScheduled to Week (Week -of Dec-14-2020)Oct-22-2020, 08:52 EDT
In Order ProcessingUnscheduled- CleanJul-08-2020, 18:16 EDT
Seems like our Mach-E's went down the line right next to each other.

Just waiting for shipping info now.
 

mamejunkie

Well-Known Member
Joined
Feb 19, 2020
Threads
20
Messages
638
Reaction score
904
Location
Orange County, CA
Vehicles
Premium Mach-E '21, Premium Mach-E '22
Occupation
Software Engineer
Country flag

Gino_A

Well-Known Member
First Name
Gino
Joined
Sep 30, 2020
Threads
1
Messages
132
Reaction score
158
Location
Fremont, CA
Vehicles
2019 Bolt, 2021 MME 2021 Pacifica, 2011 Silverado
Occupation
Retired
Country flag
I received the secondary status from my dealer yesterday.
VIN: 3FMTK3R76MMA0XXXX
Reservation date: 11/19/2019
Order date: 08/25/2020
Sent to plant: 12/15/2020
Body Shop: 01/04/2021
Trim Line: 01/05/2021
Produced: 01/06/2021
Sponsored

 
 







Top