3/14/22 Build Week Gang

hack-e

Well-Known Member
First Name
Mark
Joined
Mar 5, 2022
Threads
14
Messages
892
Reaction score
782
Location
Austin, TX
Vehicles
2022 Prem AWD ER MME
Occupation
Robotics Engineer
Country flag
Still no modules for me. But I did receive my MME Charge Port Dent Protector today. :)
I see the longest shift from original sticker date to updated sticker date for modules is 8 days, so that might put me at 03/20/22.
Well now my sticker updated from 03/12/2022 to 03/19/2022. No modules yet.
Sponsored

 
Last edited:

Tom L

Well-Known Member
First Name
Tom
Joined
Nov 5, 2021
Threads
7
Messages
391
Reaction score
418
Location
Chippewa Falls, WI
Vehicles
2018 Honda Clarity
Occupation
Retired
Country flag
No change in status this morning, but the “View Window Sticker” link on the tracker did change to the CustomerGuide (I guess this is similar to the user manual?). I thought it was odd enough to share.

Also, I can’t find it now, but yesterday I found a prompt to update my car.
No change in status for me in batch 4675.
 

Av8tor

Well-Known Member
First Name
Kevin
Joined
Aug 6, 2021
Threads
30
Messages
708
Reaction score
921
Location
Richmond, VA
Vehicles
Fusion Hybrid, MME GTPE
Occupation
Systems Engineer IOT
Country flag
I just checked (8:45am ET Saturday) and I have modules now.

How can I tell the number of modules I have?
I just copy/paste the data from the web page into Excel, scroll down to see how many rows.
 

mdpmdp

Well-Known Member
Joined
Oct 2, 2021
Threads
1
Messages
521
Reaction score
525
Location
Arizona
Vehicles
'22 Premium RWD SR Grabber Blue
Country flag
New option to manage wi-fi hotspot showed up on FordPass under the Vehicle tab. Previously only had the "Journeys" option
 

rolltide

Well-Known Member
Joined
Jul 19, 2021
Threads
15
Messages
273
Reaction score
248
Location
Atlanta
Vehicles
2022 Premium RWD SR Grabber Blue
Country flag
I just copy/paste the data from the web page into Excel, scroll down to see how many rows.
Perfect - thanks. I’m at 917 out of 978 total modules (RWD SR Premium).
 


Bill S

Well-Known Member
First Name
Bill
Joined
Sep 5, 2021
Threads
3
Messages
239
Reaction score
279
Location
Winter Haven, FL
Vehicles
22 MME Prem ER eAWD, 25 Tesla M3, 64 Falcon Sprint
Country flag
@Av8tor - Since @rolltide has most of his modules & he is in group 004728, would you think group 004754 is moving down the production line at this time?

I am #129/600 and want to "feel the rush."
 

Av8tor

Well-Known Member
First Name
Kevin
Joined
Aug 6, 2021
Threads
30
Messages
708
Reaction score
921
Location
Richmond, VA
Vehicles
Fusion Hybrid, MME GTPE
Occupation
Systems Engineer IOT
Country flag
@Av8tor - Since @rolltide has most of his modules & he is in group 004728, would you think group 004754 is moving down the production line at this time?

I am #129/600 and want to "feel the rush."
It could very well be, just need a few more people to "check-in" and we would know for sure.
 

Brendanmcgowan2

Well-Known Member
First Name
Brendan
Joined
May 26, 2021
Threads
10
Messages
140
Reaction score
114
Location
Michigan
Vehicles
Mach E
Occupation
Student
Country flag
It could very well be, just need a few more people to "check-in" and we would know for sure.
I am here!
4703
300/330
I have 1000ish BCE modules and activate vehicle button in fordpass. Any info you can get I’d appreciate it!
Vin:
3FMTK4SX4NMA19823
 
Last edited:

mdpmdp

Well-Known Member
Joined
Oct 2, 2021
Threads
1
Messages
521
Reaction score
525
Location
Arizona
Vehicles
'22 Premium RWD SR Grabber Blue
Country flag
4 of the vehicles I'm tracking from 3/7 have been built overnight. They are from varying batches (4518, 4540, 4594, 4645). Between 7 and 11 days to be marked built after going in production. Seems they're slowing down, but still getting them through (for now). Hope it keeps up for our week - would mean we should see some movement middle of next week.
 

vollski

Member
First Name
Greg
Joined
Nov 24, 2021
Threads
1
Messages
9
Reaction score
15
Location
Port Chester, NY
Vehicles
'22 Mustang Mach-e premium eAWD rapid red metallic
Country flag
@Av8tor - Since @rolltide has most of his modules & he is in group 004728, would you think group 004754 is moving down the production line at this time?

I am #129/600 and want to "feel the rush."
I'm right behind you at 312/600 in 4754... nothing meaningful updated yet
 

Slick B

Member
First Name
Stephen
Joined
Mar 5, 2022
Threads
0
Messages
10
Reaction score
4
Location
01701
Vehicles
2022 Mustang Mach e GT Iced blue metallic
Occupation
retired
Country flag
I'm right behind you at 312/600 in 4754... nothing meaningful updated yet
Where do you see the group and module info? When I put my order and vin# in all I get is the production date. Thanks
 

joes723

Well-Known Member
First Name
Joey
Joined
Nov 8, 2021
Threads
12
Messages
333
Reaction score
460
Location
Black Diamond
Vehicles
'22 GTPE IBSM "LITHEUM"
Country flag
Where do you see the group and module info? When I put my order and vin# in all I get is the production date. Thanks
On the window sticker look in the upper right area and you'll see a batch number (i.e. 004754) and a sequence number below (i.e. 516/600) and Av8tor will add you to the list on page 8. Go to Index - FordServiceInfo.Com (motorcraftservice.com) and put in your VIN to see if the modules have been loaded onto your vehicle.
 

Av8tor

Well-Known Member
First Name
Kevin
Joined
Aug 6, 2021
Threads
30
Messages
708
Reaction score
921
Location
Richmond, VA
Vehicles
Fusion Hybrid, MME GTPE
Occupation
Systems Engineer IOT
Country flag
Updated Page 8 with the newcomers, just remember they are not cutting in line, just merely sequenced.

Not a lot of updates today, I'm sure there is progress, just need folks to login and check.
Sponsored

 
 







Top