This is a good White Paper on what will be required for the 2035 mandates to work.
https://www.nationalgrid.com/document/148616/download
One conclusion:
6. The electric highway future is happening now. The timelines required for grid infrastructure upgrades, particularly transmission, are much longer than those required for EV supply equipment installation. While charger installation can be completed in a matter of months, larger transmission interconnections and upgrades can take as long as 8 years to construct. This study suggests that some locations will need upgrades before 2030. Preparation of those no-regrets sites should begin immediately.
https://www.nationalgrid.com/document/148616/download
One conclusion:
6. The electric highway future is happening now. The timelines required for grid infrastructure upgrades, particularly transmission, are much longer than those required for EV supply equipment installation. While charger installation can be completed in a matter of months, larger transmission interconnections and upgrades can take as long as 8 years to construct. This study suggests that some locations will need upgrades before 2030. Preparation of those no-regrets sites should begin immediately.